Work Approval Matrix Request # CT04717

Primary Part: GF6 FWD TRANS  CASE  24250636  Prod  Bedford Status: Complete - Approved
View / Edit Tooling Component List

Cavity & Support Items
Process Model - Bottom Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:10:45 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:27:14 PM Request Rework Review Date: 1/29/2018 12:24:26 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:32:52 PM
Submit Attachment: File:   Description:   Add

Process Model - Cover Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:11:07 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:27:37 PM Request Rework Review Date: 1/29/2018 12:43:21 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINT Keys, John (gz6shp)5/30/2012 1:33:56 PM
Submit Attachment: File:   Description:   Add

Process Model - Ejector Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:11:26 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:27:59 PM Request Rework Review Date: 1/29/2018 12:43:11 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:34:54 PM
Submit Attachment: File:   Description:   Add

Process Model - Helper Side Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:11:46 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:28:18 PM Request Rework Review Date: 1/29/2018 12:42:30 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:35:50 PM
Submit Attachment: File:   Description:   Add

Process Model - Operator Side Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:12:06 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:28:42 PM Request Rework Review Date: 1/29/2018 12:42:20 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:36:34 PM
Submit Attachment: File:   Description:   Add

Die & Support Items
Insert Assembly - Bottom Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:12:39 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:29:08 PM Request Rework Review Date: 1/29/2018 12:41:51 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:37:12 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Cover Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:13:04 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:29:32 PM Request Rework Review Date: 1/29/2018 12:39:41 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:41:06 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Ejector Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:13:52 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:29:56 PM Request Rework Review Date: 1/29/2018 12:39:28 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:41:47 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Helper Side Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:14:18 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:30:21 PM Request Rework Review Date: 1/29/2018 12:39:14 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:42:35 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Operator Side Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:14:40 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:30:49 PM Request Rework Review Date: 1/29/2018 12:39:01 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:43:06 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Top Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:15:03 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:31:15 PM Request Rework Review Date: 1/29/2018 12:38:49 PM
  ECO: CT04717-24250636-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:43:42 PM
Submit Attachment: File:   Description:   Add

Impacted Part: GF6 FWD TRANS  CASE  24250639  Prod  Bedford Status: Complete - Approved
View / Edit Tooling Component List

Cavity & Support Items
Process Model - Bottom Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:15:28 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:44:58 PM Request Rework Review Date: 1/29/2018 12:38:29 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:50:20 PM
Submit Attachment: File:   Description:   Add

Process Model - Cover Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:15:50 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:45:27 PM Request Rework Review Date: 1/29/2018 12:38:17 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:50:57 PM
Submit Attachment: File:   Description:   Add

Process Model - Ejector Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:16:11 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:45:55 PM Request Rework Review Date: 1/29/2018 12:38:01 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:51:33 PM
Submit Attachment: File:   Description:   Add

Process Model - Helper Side Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:16:32 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:46:21 PM Request Rework Review Date: 1/29/2018 12:37:44 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:52:23 PM
Submit Attachment: File:   Description:   Add

Process Model - Operator Side Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:16:53 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:46:46 PM Request Rework Review Date: 1/29/2018 12:37:29 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:52:59 PM
Submit Attachment: File:   Description:   Add

Die & Support Items
Insert Assembly - Bottom Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:17:42 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:47:15 PM Request Rework Review Date: 1/29/2018 12:37:11 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:53:35 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Cover Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:17:18 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:47:46 PM Request Rework Review Date: 1/29/2018 12:36:55 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:54:34 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Ejector Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:18:07 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:48:15 PM Request Rework Review Date: 1/29/2018 12:36:38 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:55:14 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Helper Side Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:20:04 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:48:42 PM Request Rework Review Date: 1/29/2018 12:36:24 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:55:56 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Operator Side Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:20:29 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:57:35 PM Request Rework Review Date: 1/29/2018 12:30:05 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:56:33 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Top Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:21:22 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:49:08 PM Request Rework Review Date: 1/29/2018 12:29:47 PM
  ECO: CT04717-24250639-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 1:57:20 PM
Submit Attachment: File:   Description:   Add

Impacted Part: GF6 FWD TRANS  CASE  24256262  Prod  Bedford Status: Complete - Approved
View / Edit Tooling Component List

Cavity & Support Items
Process Model - Bottom Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:21:51 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:58:30 PM Request Rework Review Date: 1/29/2018 12:29:13 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWEROINTKeys, John (gz6shp)5/30/2012 2:07:08 PM
Submit Attachment: File:   Description:   Add

Process Model - Cover Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:22:14 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 1:58:55 PM Request Rework Review Date: 1/29/2018 12:29:01 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:07:59 PM
Submit Attachment: File:   Description:   Add

Process Model - Ejector Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:22:38 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:02:16 PM Request Rework Review Date: 1/29/2018 12:27:46 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:08:50 PM
Submit Attachment: File:   Description:   Add

Process Model - Helper Side Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:23:21 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:02:46 PM Request Rework Review Date: 1/29/2018 12:26:54 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:09:46 PM
Submit Attachment: File:   Description:   Add

Process Model - Operator Side Effort:  New
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:28:26 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:03:13 PM Request Rework Review Date: 1/29/2018 12:26:40 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:10:23 PM
Submit Attachment: File:   Description:   Add

Die & Support Items
Insert Assembly - Bottom Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:30:28 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:03:36 PM Request Rework Review Date: 1/29/2018 12:26:09 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:12:00 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Cover Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:20:57 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:04:05 PM Request Rework Review Date: 1/29/2018 12:25:23 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:12:39 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Ejector Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:19:36 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:04:30 PM Request Rework Review Date: 1/29/2018 12:25:09 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:13:31 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Helper Side Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:19:17 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:05:03 PM Request Rework Review Date: 1/29/2018 12:24:59 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:14:05 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Operator Side Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:18:57 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:05:26 PM Request Rework Review Date: 1/29/2018 12:24:48 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:14:46 PM
Submit Attachment: File:   Description:   Add

Insert Assembly - Top Effort:  Major
Design Coordinator PL Name:
Assigned Date:
Status:
Fisher, Jason ( fzhdw1 )
5/17/2011 12:18:36 PM
Complete - Approved
Assign Project Leader
  Item Design Coordinator Project Leader PTE Approval
  Select Cancel Complete PL Name: Keys, John ( gz6shp ) Approve PTE Name: Goller, Jon ( mz2lx9 )
Completion Date: 5/30/2012 2:05:48 PM Request Rework Review Date: 1/29/2018 12:24:38 PM
  ECO: CT04717-24256262-1-028   Status: Complete - Approved
 
 File NameDescriptionUser NameUpload Date
Delete POWERPOINTKeys, John (gz6shp)5/30/2012 2:15:26 PM
Submit Attachment: File:   Description:   Add